Categories
Bid Project

Bella Vista – Bid Due 05/02/24 at 3:00 PM

PROJECT DESCRIPTION: 

The proposed project includes 48 new apartment units that are in two and three-story buildings built on top of a podium deck, with a subterranean garage containing 58 parking spaces and a 10-space surface parking lot. The project proposes to demolish (4) one-story office buildings and associated asphalt parking lots and landscaping. The site will include new terraced landscaping off La Cumbre.

 

APPLICABLE TRADES:

Trades will include survey, demolition, grading, underground utilities, site and structural concrete, steel, sheet metal, pavers, masonry, landscaping, rough carpentry, insulation, roofing, waterproofing, fencing, drywall, plaster, painting, cabinetry, countertops, tile, flooring, elevator, windows & doors, overhead doors, MEP’s, signage, appliances, access doors, toilet accessories fire extinguishers, fire alarm and fire sprinklers, low voltage, security, HVAC.

 

THIS IS A PREVAILING WAGE PROJECT

 

INSURANCE:

Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

BONDING: Performance and labor bonding may be required; costs will be added to your proposal

BID DUE DATE:  Thursday, May 2nd at 3:00PM

MCGILLIVRAY CONTACTS:

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link.  Or, copy and paste the link into your browser.

LINK:

https://www.dropbox.com/scl/fo/7kwd9i6xqpembzju1h630/AA3C7ODWvRKUbVINpWyK4Yo?rlkey=eu3oauriqtaacw1f2ojscqzb9&dl=0

Categories
Bid Project

Goleta Primary Clinic Tenant Improvements – Bid Due 04/23/24 at 3:00 PM

PROJECT DESCRIPTION: 

This project is a 4,426 SF interior remodel in an existing office building for a new medical office.  The scope of the project includes new interior non-load bearing walls, offices, exam rooms, and other support spaces.

APPLICABLE TRADES:

Soft Demo, Concrete Trench Patch, Cabinetry, Countertops, Steel, Stainless Steel, Finish Carpentry, Roof Patching, Insulation, Doors, Acoustical Ceiling Tiles, Drywall, Flooring, Painting, Tile, Toilet Accessories, Window Coverings, Signage, Fire Extinguishers, Fire Sprinklers, HVAC, Plumbing, Electrical, Communication, and Fire Alarm

Addendums #1, #2, and #4 have been issued.

THIS IS NOT A PREVAILING WAGE PROJECT

THIS IS NOT AN OSHPD PROJECT

INSURANCE:

Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

BONDING: Performance and labor bonding may be required; costs will be added to your proposal

BID DUE DATE:  Tuesday, April 23rd at 3:00PM

MCGILLIVRAY CONTACTS:

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link.  Or, copy and paste the link into your browser.

LINK:

https://www.dropbox.com/scl/fo/ukosyyvsoii89dlevnukr/APL-ERe-Ttbp2AVI1B–vYU?rlkey=z1gvz3bp68gloqwyekn8kq306&dl=0

Categories
Bid Project

700 Linden Ave Tenant Improvements – Bid Due 04/09/24 at 3:00 PM

PROJECT DESCRIPTION: 

Improvements to interior of building within tenant suite. 

  1. Bettina – Area = 507 SF.
  2. Channel Islands – Area = 1162 SF.
  3. Corazon – Area = 507 SF.

*** SUBMIT A SEPARATE PRICE PER SUITE FOR EACH APPLICABLE TRADE.  PROJECT WILL BE AWARDED BASED ON TOTAL PRICE.

 

ESTIMATED START: ASAP

APPLICABLE TRADES:

Demolition, Concrete, Fire Alarm, Cabinetry, Countertops, Insulation, Doors and Hardware, Acoustical Ceilings, Drywall, Metal Stud Framing, Sheet Metals, Flooring, Epoxy, FRP Walls, Stainless Steel, Kitchen Equipment, Painting, Solid Surface Countertops, Tile, Signage, Fire Sprinkler, Fire Extinguishers and Cabinets, HVAC, Plumbing, Electrical & Low Voltage

 

THIS IS NOT A PREVAILING WAGE PROJECT

INSURANCE:

Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

BONDING: Performance and labor bonding may be required; costs will be added to your proposal

BID DUE DATE:  Tuesday, April 9th at 3:00PM

MCGILLIVRAY CONTACTS:

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link.  Or, copy and paste the link into your browser.

LINK:

https://www.dropbox.com/scl/fo/39nuwgalvxrzhsgujebct/h?rlkey=66d7tbgslssrm35ecdt7msacu&dl=0

Categories
Project

McKinley School

Address

350 Loma Alta Drive, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

This project involved renovating a large second-floor classroom with an attached restroom, including an interior stairwell as the entryway to the classroom.

It also required installing a new four-story structural steel tower in the middle of a historical building, cutting into and re-framing multiple rooftops for access through the building for the elevator tower and onto basement footings, and installing a new elevator and elevator entrances.

“I have always enjoyed working on Santa Barbara Unified School District projects, especially the buildings that were built in the 1920s. Their architecture and design are historical treasures.” – Bill Langford

Status

Completed: November 2020 – September 2021

Categories
Bid Project

425 Garden St. Multi Family – Bid Due 04/04/24 at 3:00 PM

PROJECT DESCRIPTION: 

The proposed project is a 4 story, 36-unit apartment building. The existing structures and pavement will be demolished. Parking areas will be developed on Garden Street.

Trades will include survey, demolition, grading, underground utilities, soils stabilization, site and structural concrete, pavers, landscaping, rough carpentry, roofing, drywall, plaster, painting, cabinetry, flooring, elevator, windows & doors, MEP’s, fire alarm and fire sprinklers.

 

THIS IS NOT A PREVAILING WAGE PROJECT

 

INSURANCE:

Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

BONDING: Performance and labor bonding may be required; costs will be added to your proposal

BID DUE DATE:  Thursday April 4th at 3:00PM

MCGILLIVRAY CONTACTS:

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link.  Or, copy and paste the link into your browser.

LINK:

https://www.dropbox.com/scl/fo/2x1ixrif5iae0mgm29xck/h?rlkey=j5mv562mj7eanmlsxsljt954d&dl=0

Categories
Project

Birdsong Ranch

Address

8442 Santa Ana Road, Ventura

Client

Birdsong Ranch LLC

Project Description

2019 – 2021: Historic remodel of the 1919 house, barn, and dairy

2022 – 2023: Historic remodel of the house, barn, dairy, landscaping, and site work

2023 – 2024: Barn upgrades, site work, and landscaping

“It was rewarding to work on the conservation and revitalization of a piece of the Ojai Valley’s history.” – Nathan Batelaan

“The history and natural beauty of this landmark property will continue to astound generations to come. Honored to be a part of restoring a 1916 ranch house back to its original glory.” – Hanna Peterson

Status

In Progress: 2019 – Present

Categories
Project

Ojai Valley School Upper Campus Fire Rebuild

Photography: Logan Hall

Address

10820 Reeves Road, Ojai

Client

Ojai Valley School

Project Description

During the Thomas Fire, the girls’ dorm, science building, and Head of School’s home burned down. We built a new girls’ dorm, commons building (with a commercial kitchen, library, offices, and dining hall), and a new science center comprised of four buildings.

Partners

Frederick Fisher Partners

OVS

Status

Completed: November 2019 – August 2021

Categories
Project

Summerland Elementary School

Photography: Jason Rick

Address

135 Valencia Road, Summerland

Client

Carpinteria Unified School District

Project Description

For this project, McGillivray needed to demolish the previous school and rebuild an entirely new school with two buildings. We feel very proud to have been able to contribute to the rebuilding of this local school.

Partners

KBZ Architects

Carpinteria Unified School District

Status

Completed: October 2021 – December 2022

Categories
Project

Santa Barbara High School Visual Arts Design Academy (VADA)

Address

700 E. Anapamu Street, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

New Art Building and Site Work

Partners

KBZ Architects

Santa Barbara Unified School District

Status

In Progress: December 2022 – Spring 2024

Categories
Project

Peabody Charter School New Classroom Buildings

Address

3018 Calle Noguera, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

This project consisted of the construction of three single-story classroom buildings (one duplex and two triplexes) and eight new state-of-the-art classrooms, as well as the demolition of one existing single-story classroom on a raised concrete foundation.

Partners

DSA (Inspector on Record)

Peabody Principal & Assistant Principal

Santa Barbara Unified School District

Status

Completed: August 2022 – August 2023