Categories
Bid Project

Chaparral Place Bid Invitation

PROJECT DESCRIPTION: 

The proposed project includes new publicly funded multi-family residential buildings, including two- and three-story structures, totaling 50 units. Each unit has its own private balcony. There will be approximately 97 parking spaces. 

 

APPLICABLE TRADES:

Trades will include but not be limited to: survey, shoring, fencing, grading, underground utilities, asphalt, site and structural concrete, steel, rebar, gypcrete, ornamental steel, sheet metal, masonry, landscaping, rough carpentry, insulation, roofing, waterproofing, drywall, plaster, painting, cabinetry, countertops, tile, flooring, elevator, windows & doors, signage, appliances, playground surfacing and equipment, bicycle racks, toilet accessories, MEP’s, fire alarm and fire sprinklers, low voltage, security.

 

VALUE ENGINEERING & ALTERNATES:

All prospective bidders are required to furnish a list of potential value engineering options for the consideration of the project owner, if value engineering becomes necessary for the successful execution of the project.

The bidding contractors are also asked to provide pricing for the following alternates:

  1. Deductive Alternate for OCIP

 

NOTE: This is NOT a prevailing wage project.
 
 
 

INSURANCE:
Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.

 

BONDING:

Performance and labor bonding may be required; costs will be added to your proposal

 

BID DUE DATE:  Friday, September 11, 2026 @ 3:00 PM

 


MCGILLIVRAY CONTACTS:

 

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link at top of page. Click tab to open the link.  Or, copy and paste the link URL into your browser.

https://www.dropbox.com/scl/fo/fia7zl5mhwsqq98symmwn/ACGIwpHNGjqHbrHN-wLLWKI?rlkey=ednk4qmesxgp6vd6o29pqlb3e&st=8g5gv3e2&dl=0

 

If you are a subcontractor planning to bid on this project, please confirm using the form below.

Categories
Project

15 South Hope

Address

15 S Hope Avenue, Santa Barbara, CA 93105

Client

Housing Authority of the City of Santa Barbara

Project Description

This project consists of the construction of a new four-story mixed-use development featuring 46 affordable housing apartments. All units are designated as affordable housing and will help expand housing opportunities within the community.

Developed in partnership with the Housing Authority of the City of Santa Barbara, the project is currently underway, with over-excavation recently completed as the team prepares for the next phase of construction. Completion is anticipated in fall 2027.

Status

In Progress

Categories
Project

Aliso Kindergarten

Address

4545 Carpinteria Avenue, Carpinteria, CA 93013

Client

​​​​​​​Carpinteria Unified School District

Project Description

This project includes the construction of a new ground-up kindergarten building and associated site improvements for Carpinteria Unified School District.

Recent progress includes the completion of over-excavation activities, with the team now beginning work on the mat footing as construction moves into its next phase. Construction began in early 2026 and is anticipated to be completed in spring 2027. 

Status

In Progress

Categories
Project

Oak Dining Room at Ojai Valley Inn

Address

905 Country Club Rd, Ojai, CA 93023

Client

Ojai Valley Inn

Project Description

Our team removed a section of the roof, carefully dismantled the existing structural steel, and craned in a new moment frame to eliminate three interior columns that previously supported the space. This structural modification allowed for a fully open floor plan, creating a cleaner visual experience and greater flexibility within the dining room.

The work was completed in just over two weeks while the hotel was closed for its annual maintenance period. Each phase, from demolition and roof removal to structural steel installation and finish work, was tightly coordinated to meet the compressed schedule. The result is a refined dining space that feels expansive and intentional, with added flexibility to support a variety of uses beyond dining.

Status

Completed Winter 2026

Categories
Project

Ventura College STEM Building

Address

4667 Telegraph Road, Ventura, CA 93003

Client

Ventura County Community College District

Project Description

This project involves the construction of a new modular STEM building along with associated site work. Located just a few blocks from our office, it’s especially meaningful to contribute to a project within our own community. Construction began in September 2025 and is expected to be completed by January 2026.

Status

In Progress

Categories
Project

821 State Street

Address

821 State Street, Santa Barbara

Client

Housing Authority of the City of Santa Barbara

Project Description

This project consisted of the thoughtful renovation of the former Sur Le Table store located on State Street. We successfully converted the first floor into a commercial lease space, while the back portion of the building, along with the second floor, have been transformed into workforce housing. The development includes 14 well-designed studio apartments, with ten situated on the second floor and four on the first floor. Furthermore, the second floor is equipped with a community space intended to enhance the living experience for residents.

Status

March 2023 – November 2023

Categories
Project

Bella Vista

Address

200 N La Cumbre, Santa Barbara

Client

Housing Authority of the City of Santa Barbara

Project Description

The project involves the demolition of existing structures and construction of 48 new low-income housing units. It is a privilege to collaborate once again with the Housing Authority and contribute to their vital mission of providing housing for individuals and families in need.

Construction is progressing steadily with the podium forecasted to be complete by the end of this month. The team is focused on meeting this milestone to keep the project on schedule.

Status

January 2025 – Present

Categories
Project

425 Garden Apartments

Address

425 Garden Street, Santa Barbara, CA 93101

Client

Clear Sky 425 Garden Street LP

Project Description

Located on Garden Street in the heart of downtown Santa Barbara, 425 Garden provides 36 new residential units within walking distance of local businesses, services, and transit. The project required extensive coordination from start to finish due to the site’s limited footprint and its location along one of the city’s primary thoroughfares. Now complete, the development brings new housing opportunities to the area while contributing to the continued evolution of the downtown corridor.

Status

Complete

Categories
Project

Carrillo Gymnasium Renewal

Address

114 East Carrillo Street, Santa Barbara

Client

City of Santa Barbara

Project Description

Carrillo Gym is in its final days, bringing this meaningful project to a close. It has been especially rewarding to contribute to the preservation and enhancement of the oldest building in Santa Barbara.

Status

In Progress

Categories
Project

Channel Islands Beach Community Services District Operations Facility

Address

353 Santa Monica Drive, Oxnard

Client

Pete Martinez

Project Description

We are partnering with Pete Martinez to build a new administrative and operations building for the Channel Islands Beach Community Services District Operations Facility. The project is currently 95% complete. We look forward to a successful completion of this project in the near future.

Status

In Progress: December 2023 – Present