700 Linden Ave Tenant Improvements – Bid Due 04/09/24 at 3:00 PM

PROJECT DESCRIPTION: 

Improvements to interior of building within tenant suite. 

  1. Bettina – Area = 507 SF.
  2. Channel Islands – Area = 1162 SF.
  3. Corazon – Area = 507 SF.

*** SUBMIT A SEPARATE PRICE PER SUITE FOR EACH APPLICABLE TRADE.  PROJECT WILL BE AWARDED BASED ON TOTAL PRICE.

 

ESTIMATED START: ASAP

APPLICABLE TRADES:

Demolition, Concrete, Fire Alarm, Cabinetry, Countertops, Insulation, Doors and Hardware, Acoustical Ceilings, Drywall, Metal Stud Framing, Sheet Metals, Flooring, Epoxy, FRP Walls, Stainless Steel, Kitchen Equipment, Painting, Solid Surface Countertops, Tile, Signage, Fire Sprinkler, Fire Extinguishers and Cabinets, HVAC, Plumbing, Electrical & Low Voltage

 

THIS IS NOT A PREVAILING WAGE PROJECT

INSURANCE:

Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

BONDING: Performance and labor bonding may be required; costs will be added to your proposal

BID DUE DATE:  Tuesday, April 9th at 3:00PM

MCGILLIVRAY CONTACTS:

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link.  Or, copy and paste the link into your browser.

LINK:

https://www.dropbox.com/scl/fo/39nuwgalvxrzhsgujebct/h?rlkey=66d7tbgslssrm35ecdt7msacu&dl=0

Categories
Project

McKinley School

Address

350 Loma Alta Drive, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

This project involved renovating a large second-floor classroom with an attached restroom, including an interior stairwell as the entryway to the classroom.

It also required installing a new four-story structural steel tower in the middle of a historical building, cutting into and re-framing multiple rooftops for access through the building for the elevator tower and onto basement footings, and installing a new elevator and elevator entrances.

“I have always enjoyed working on Santa Barbara Unified School District projects, especially the buildings that were built in the 1920s. Their architecture and design are historical treasures.” – Bill Langford

Status

Completed: November 2020 – September 2021

Categories
Bid Project

425 Garden St. Multi Family – Bid Due 04/04/24 at 3:00 PM

PROJECT DESCRIPTION: 

The proposed project is a 4 story, 36-unit apartment building. The existing structures and pavement will be demolished. Parking areas will be developed on Garden Street.

Trades will include survey, demolition, grading, underground utilities, soils stabilization, site and structural concrete, pavers, landscaping, rough carpentry, roofing, drywall, plaster, painting, cabinetry, flooring, elevator, windows & doors, MEP’s, fire alarm and fire sprinklers.

 

THIS IS NOT A PREVAILING WAGE PROJECT

 

INSURANCE:

Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

BONDING: Performance and labor bonding may be required; costs will be added to your proposal

BID DUE DATE:  Thursday April 4th at 3:00PM

MCGILLIVRAY CONTACTS:

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link.  Or, copy and paste the link into your browser.

LINK:

https://www.dropbox.com/scl/fo/2x1ixrif5iae0mgm29xck/h?rlkey=j5mv562mj7eanmlsxsljt954d&dl=0

Categories
Project

Birdsong Ranch

Address

8442 Santa Ana Road, Ventura

Client

Birdsong Ranch LLC

Project Description

2019 – 2021: Historic remodel of the 1919 house, barn, and dairy

2022 – 2023: Historic remodel of the house, barn, dairy, landscaping, and site work

2023 – 2024: Barn upgrades, site work, and landscaping

“It was rewarding to work on the conservation and revitalization of a piece of the Ojai Valley’s history.” – Nathan Batelaan

“The history and natural beauty of this landmark property will continue to astound generations to come. Honored to be a part of restoring a 1916 ranch house back to its original glory.” – Hanna Peterson

Status

In Progress: 2019 – Present