Categories
Project

821 State Street

Address

821 State Street, Santa Barbara

Client

Housing Authority of the City of Santa Barbara

Project Description

This project consisted of the thoughtful renovation of the former Sur Le Table store located on State Street. We successfully converted the first floor into a commercial lease space, while the back portion of the building, along with the second floor, have been transformed into workforce housing. The development includes 14 well-designed studio apartments, with ten situated on the second floor and four on the first floor. Furthermore, the second floor is equipped with a community space intended to enhance the living experience for residents.

Status

March 2023 – November 2023

Categories
Project

Bella Vista

Address

200 N La Cumbre, Santa Barbara

Client

Housing Authority of the City of Santa Barbara

Project Description

The project involves the demolition of existing structures and construction of 48 new low-income housing units. It is a privilege to collaborate once again with the Housing Authority and contribute to their vital mission of providing housing for individuals and families in need. The demolition phase has been successfully completed, and we have now commenced a significant grading operation to prepare for the concrete foundation.

Status

January 2025 – Present

Categories
Project

Carrillo Gymnasium Renewal

Address

114 East Carrillo Street, Santa Barbara

Client

City of Santa Barbara

Project Description

The Carrillo Gymnasium Renewal is currently in the demolition phase, focusing on exterior repairs for this historic building, which is nearly 100 years old.

Status

In Progress

Categories
Project

La Cumbre & Santa Barbara Community Academy Makerspace

Address

2255 Modoc Road, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

Upgrades to existing MPR building of approximately 3,895 SF.
New restrooms, lighting, flooring, acoustical wall panels
Upgraded fire system
Accessibility upgrades per current codes
New roof system

Status

In Progress: October 2023 – Summer 2024

Categories
Project

Santa Barbara High School Visual Arts Design Academy (VADA)

Address

700 E. Anapamu Street, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

New Art Building and Site Work

Partners

KBZ Architects

Santa Barbara Unified School District

Status

In Progress: December 2022 – Spring 2024

Categories
Project

Peabody Charter School New Classroom Buildings

Photography: Jason Rick

Address

3018 Calle Noguera, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

This project consisted of the construction of three single-story classroom buildings (one duplex and two triplexes) and eight new state-of-the-art classrooms, as well as the demolition of one existing single-story classroom on a raised concrete foundation.

Partners

Santa Barbara Unified School District

KBZ Architects

Status

Completed: August 2022 – August 2023

Categories
Project

Vera Cruz Village

Address

116 E. Cota Street, Santa Barbara

Client

Housing Authority of the City of Santa Barbara

Project Description

The Housing Authority of the City of Santa Barbara development at 116 E. Cota St. is designed for anyone who is transitioning out of homelessness or is at risk of homelessness.

Partners

DesignARC

Housing Authority of the City of Santa Barbara

Status

Completed: December 2021 – August 2023

Press

Independent: Housing Authority of the City of Santa Barbara Unveils 28-Unit Vera Cruz Village

Noozhawk: Santa Barbara Housing Authority’s New Vera Cruz Village Gives Residents a Place to Call Home

Categories
Project

McKinley School

Address

350 Loma Alta Drive, Santa Barbara

Client

Santa Barbara Unified School District

Project Description

This project involved renovating a large second-floor classroom with an attached restroom, including an interior stairwell as the entryway to the classroom.

It also required installing a new four-story structural steel tower in the middle of a historical building, cutting into and re-framing multiple rooftops for access through the building for the elevator tower and onto basement footings, and installing a new elevator and elevator entrances.

“I have always enjoyed working on Santa Barbara Unified School District projects, especially the buildings that were built in the 1920s. Their architecture and design are historical treasures.” – Bill Langford

Status

Completed: November 2020 – September 2021

Categories
Project

CenCal Health

Categories
Project

Grace Village

Address

3869 State Street, Santa Barbara, CA 93105

Client

Housing Authority of Santa Barbara 

Project Description

60 Unit Senior Living and common area office, new construction

Completed

2018