Categories
Project

Santa Barbara Fire Station

Address

121 West Carrillo Street, Santa Barbara, CA 93101

Client

City of Santa Barbara 

Completed

2008

Categories
Project

Ventura College Sports Complex

Address

4667 Telegraph Road, Ventura, CA 93003

Client

Ventura Community College District

Project Description

Size: 10-Acre Site

The goal was to provide Ventura College with a new venue for athletic activities. As a result of the completed project, Ventura College Campus received a new stadium, track and field, bleachers and concession stand.

Worked successfully within the Department of State Architecture’s rigorous building codes to complete the stadium project.Installed advanced drainage systems for the artificial turf surface.Provided cost-saving engineering recommendations to eliminate massive exporting of the top-soil.Successfully helped the owner to keep the cost changes of the project to a minimum and well below industry standards.Project received several awards for construction and architecture.

Completed

2009

Categories
Project

Ojai Valley Community Hospital

Address

1306 Maricopa Highway, Ojai, CA 93023

Client

Ojai Valley Community Hospital 

Completed

2010

Categories
Project

Ventura Cancer Center

Address

2900 Loma Vista Road, Ventura, CA 93002

Client

Community Memorial Health Center 

Project Description

New Construction of a 23,000 sq. ft. Cancer Center including site demolition of existing structures and site work.

Completed

2010

Categories
Project

Artisan Court

Address

422 E. Cota Street, Santa Barbara, CA 93101

Client

Artisan Court LP 

Project Description

Public Housing. 

Completed

2011

Categories
Project

Libbey Bowl

Address

205 E. Ojai Avenue, Ojai, CA 93023

Client

City of Ojai

Project Description

Extensive site reconstruction of an existing historical park with approx. 3,772 sq ft amphitheater 

Size: 991 seats on a 7.5-Acre Site

Completed reconstruction of the historic Libbey Bowl was undertaken by the City of Ojai in 2010. Construction was completed on schedule and performances resumed in June of 2011. This famous venue is of international caliber and has accommodated many of the world’s top performers during its 60 years of operation.
 

McGillivray Construction (MCG) successfully replaced the entire facility with-in a highly sensitive environmental area (e.g.: a creek running through the project, nesting birds, and the mandate to protect native trees were a few of the sensitivities influencing the construction process).

McGillivray Construction was the force behind the redesign of grading recommendations for the building underpinnings. This allowed the project to move forward over very unstable soil conditions in a water table higher than the bottom of the footing. MCG’s recommendations to identify and engage the services of specific geo-technical consultants ultimately saved the client substantial money and time.

Project updated the historic Outdoor Performing Arts Center with 991 seats.

McGillivray Construction (MCG) successfully replaced the entire facility with-in a highly sensitive environmental area (e.g.: a creek running through the project, nesting birds, and the mandate to protect native trees were a few of the sensitivities influencing the construction process).

McGillivray Construction was the force behind the redesign of grading recommendations for the building underpinnings. This allowed the project to move forward over very unstable soil conditions in a water table higher than the bottom of the footing. MCG’s recommendations to identify and engage the services of specific geo-technical consultants ultimately saved the client substantial money and time.

Project updated the historic Outdoor Performing Arts Center with 991 seats.

Successfully helped the owner to keep the cost changes of the project to a minimum and well below industry standards.

Completed

2011

Categories
Project

Carpinteria High School Culinary Arts

Address

4810 Foothill Road, Carpinteria, CA 93013

Client

Carpinteria Unified School District 

Project Description

Kitchen remodel.

Completed

2011

Categories
Project

Bradley Studios

Address

512 Bath St., Santa Barbara, CA

Client

Bradley Studios, L.P 

Project Description

Demolition of Five Existing Structures, Construction of New Apartment Housing for HACSB Consisting of Seven Building totaling 35,775 sq. ft. 

Completed

2012

Categories
Project

The Orchards at Santa Paula

Address

220 W. main Street, Santa Paula, CA 93060

Client

Housing Authority City Santa Paula 

Project Description

Selective Demolition to an Existing 12,582 sq. ft. Building for Remodel, Upgrades, and 4,142 sq. ft. Addition. 

Completed

2012

Categories
Project

UCSB Ocean Science Education Building – Phase 1

Address

Santa Barbara, CA

Client

The Regents of the University of California, Santa Barbara 

Project Description

New Construction of 2 Story, 15,000 sq. ft., Ocean Science and Education Building at the University California Santa Barbara Campus for NOAA. 

Completed

2013