![](https://mcgcorporation.com/wp-content/uploads/2024/12/Providence-School.jpg)
PROJECT DESCRIPTION:
The project consists of three parts:
- New two-story gymnasium complex, classrooms, library, chapel and office administrations
- Alterations to an existing single story main building – “Block Building”
- Alterations to the existing parking lot, new bicycle parking/storage, landscape and hardscape improvements throughout the site.
APPLICABLE TRADES:
Trades will include demolition, concrete, shoring, roofing, cabinetry, /countertops, insulation, storefront, roofing, doors and hardware, drywall, plaster, flooring, epoxy terrazzo, FRP walls, acoustical ceilings, painting, pavers, tile, window treatment, signage, lockers, toilet accessories/partitions, stainless steel, kitchen equipment, HVAC, plumbing, electrical, fire sprinklers, fire alarm system
THIS IS NOT A PREVAILING WAGE PROJECT
INSURANCE:
Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.
BONDING: Performance and labor bonding may be required; costs will be added to your proposal
BID DUE DATE: Tuesday, January 21st at 3:00PM
MCGILLIVRAY CONTACTS:
- Russell Trozera – Russell@mcgillivrayconstruction.com – Specific questions about plans or project
- David Immel – Immel@mcgillivrayconstruction.com – General inquires
- Nick Chavira – Estimating@mcgillivrayconstruction.com – Bid Submissions
PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link. Or, copy and paste the link into your browser.
LINK: