
PROJECT DESCRIPTION:
The project consists of three parts:
- New two-story gymnasium complex, classrooms, library, chapel and office administrations
- Alterations to an existing single story main building – “Block Building”
- Alterations to the existing parking lot, new bicycle parking/storage, landscape and hardscape improvements throughout the site.
APPLICABLE TRADES:
Trades will include demolition, concrete, shoring, roofing, cabinetry, /countertops, insulation, storefront, roofing, doors and hardware, drywall, plaster, flooring, epoxy terrazzo, FRP walls, acoustical ceilings, painting, pavers, tile, window treatment, signage, lockers, toilet accessories/partitions, stainless steel, kitchen equipment, HVAC, plumbing, electrical, fire sprinklers, fire alarm system
THIS IS NOT A PREVAILING WAGE PROJECT
INSURANCE:
Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.
BONDING: Performance and labor bonding may be required; costs will be added to your proposal
BID DUE DATE: Tuesday, January 28th at 3:00PM
MCGILLIVRAY CONTACTS:
- Russell Trozera – Russell@mcgillivrayconstruction.com – Specific questions about plans or project
- David Immel – Immel@mcgillivrayconstruction.com – General inquires & Bid Submissions
PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link at top of page. Click tab to open the link. Or, copy and paste the link URL into your browser.
If you are a subcontractor planning to bid on this project, please confirm using the form below.