PROJECT DESCRIPTION: The proposed project is a 3,800 SF renovation of existing office spaces to revise the layout and create new administrative offices, conference room and lounge. It will be transformed from an existing building that currently houses differing tenants.
Applicable trades: Hard demo, soft demo, concrete trench patch, cabinetry, countertops, steel, stainless steel, rough carpentry, finish carpentry, roof patching, insulation, doors, waterproofing, upholstering, Muraflex storefront, glass, panels, acoustical ceiling tiles, drywall, flooring, painting, tile, wall coverings, toilet accessories, window coverings, signage, spray-on fire protection, fire extinguishers, fire sprinklers, HVAC, plumbing, electrical, communication, and fire alarm.
This IS NOT a prevailing wage project
This IS NOT an OSHPD project
BID DATE: Thursday, December 17, 2020 @ 2PM
ESTIMATED START: February 2021
McGILLIVRAY CONTACT:
Russ Trozera, David Immel
russell@mcgillivrayconstruction.com immel@mcgillivrayconstruction.com
PLEASE REPLY TO CONFIRM YOU WILL BE BIDDING THIS PROJECT.
Insurance: Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles. $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.
Bonding: Performance and labor bonding may be required. Costs will be added to your proposal7