Categories
Bid Project

Villanova Prep School Gym – Bid Due 05/29/24 at 3:00 PM

PROJECT DESCRIPTION: 

The proposed project consists of removing existing skylight, replacing roof trusses, repairing roof underlayment, roofing, and insulation as required. Accessibility upgrades will be made to comply with section 11B of the California Building Code.

APPLICABLE TRADES:

Trades will include surveying, demolition, site concrete, striping & signage, rough carpentry, sheet metal, insulation, roofing, drywall, handrails, painting, tile, flooring, toilet accessories, sports equipment, MEP’s, fire alarm and fire sprinklers.

 

THIS IS NOT A PREVAILING WAGE PROJECT

INSURANCE:

Bidders shall provide the following insurance minimums: commercial general liability insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

BONDING: Performance and labor bonding may be required; costs will be added to your proposal

BID DUE DATE:  Wednesday, May 29th at 3:00PM

MCGILLIVRAY CONTACTS:

PLANS AND SPECIFICATIONS: Plans can be viewed in our office plan room at 3140 Loma Vista Road, Ventura, Ca. 93003. Plans can be downloaded via the link below Press Ctrl + Click to open link.  Or, copy and paste the link into your browser.

LINK:

https://www.dropbox.com/scl/fo/ux4ix8zcofexv0ce34w7b/AH4ZZcQLB7lt_U0O1UilX3Y?rlkey=sdor7ilns5rn6w9wbodxmvr9t&st=b5antyot&dl=0